Customization: | Available |
---|---|
Certification: | ISO9001, CE, ISO14001,ISO45001 |
Working Medium: | R32 |
Still deciding? Get samples of US$ 1870/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | VLKS-06CPB2B | VLKS-09CPB2B | VLKS-12CPB2B | VLKS-16CPB2B | |
Heating capacity A7/W35ºC(EN14511) | KW | 6.21KW | 8.9KW | 12KW | 16.3 |
Heating capacity A2/W35ºC(EN14511) | KW | 5.56 | 7.97 | 10.8 | 14.49 |
COP A2/W35(EN14511) | 4.56 | 4.53 | 4.43 | 4.49 | |
COP A7/W35 (EN14511) | 4.93 | 4.92 | 4.8 | 4.88 | |
Cooling capacity A35/W7ºC | KW | 4.9 | 5.9 | 8.1 | 11.4 |
EER A35/W7 (EN14511) | 2.97 | 2.95 | 2.86 | 2.85 | |
Cooling capacity A35/18 (EN14511) | KW | 6.35 | 8.1 | 11 | 15.6 |
EER A35/W18 (EN14511) | 3.97 | 3.89 | 3.53 | 3.63 | |
Electric supply | 230V/50Hz | 230V/50Hz | 230V/50Hz | 230V/1Ph Hz | |
Refrigerant | R32 | ||||
Unit dimensions LXWXH | mm | 1115x425X710 | 1115x425x710 | 1115x425x960 | 1115x425x1280 |
Package dimension LXWXH | mm | 1160x520x860 | 1160x520x860 | 1160x520x1110 | 1160x520x1440 |
Net Weight | Kg | 90 | 90 | 105 | 140 |
Noise level | dB(A) | 46 | 46 | 50 | 52 |
Loading quantity for 20'/40' | 44/88 | 44/88 | 44/88 | 22/44 |
Full DC Inverter Technology
With this technology, user can enjoy a maximum level of comfort at the lowest costs monobloc heat pump in the market is to save space and money. For sure, the R32 Full inverter heat pump will be the future trend.
Maximum Water temperature 60°C
The highest water temperature can reach 60 degrees, can uninterruptedly meet the bathing needs of the whole family, so that you can experience a sound surging bath.
EVI Monobloc Air to Water Heat Pumps Working Principle Diagram
Vegardis provides the monoblock heat pump with an integrated main circulation pump. During installation, the installer needs to ensure the proper connection of the heat pump with other components, such as the buffer tank (for space heating/cooling), storage water tank (for domestic hot water), and water pumps (for circulating space heating/cooling water and domestic hot water)Additionally, external fittings are required, including the safety valve, water refill valve, and hot water valves (three-way valve). lt is necessary to incorporate a temperature sensor in the storage water
Q: Why choose our company?
A: over 15 years in heat pump industry with 200 skilled workers and 20+ engineer
Q: What support do you offer to clients?
A: We can provide product certification requirements for local markets; provide catalogs, technical manuals.
Q: What is your terms of payment for heat pump ?
A: For small order, 100% paid in advance. 30% T/T in advance ,balance before shipment.
Q.How do l know if your heat pump are good quality?
A: Sample order is acceptable for testing your market and checking our quality And we have strict quality control systems from raw material incoming until finished product delivery out.
Q: What certifications do your heat pump has?
A: Our heat pump have CE certification,ISO9001
Q: How about your delivery time?
A: Generally, it will take 25 to 40 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.